|
Soil Management
Vancouver development companies
are cutting costs and eliminating long distance hauling by taking advantage of the Barge Loading Facility at 89 Rogers Street.
Trucks that haul excavated soil can reduce their emissions to the environment by making the short trip to the CSM site
instead of journeying to landfills outside the city.
Developers apply to Environment Canada to have their site
tested to qualify for the Disposal at Sea program. Trucks make the short trip to 89 Rogers Street and dump
their loads at the Barge Loading Facility. A Coast Marine Tug tows the self dumping scow loaded with their
contaminant free soil to legal dumping grounds.
This is environmentally safe and cost effective method of
preparing a site.
|